Riverton Fire Hall
Owner. Biftost Riverton Municipality
Square Footage 7500sq
General Contractor. Tria Products
Contract Amount. Stipulated Sum Design Build
Engineer Norstruc Engineering
Start date May 2021
Completion April 2022
Tria Products was the successful bid on the design build project. Tria worked alongside the municipality with the layout and design of the Firehall. Tria Products proposed in the bid submission of a concrete precast building with a steel roof joists system. The insulated panels have a value of R22. The roof joists have a span of 10 feet on centre with galvanized Z Bars for purlins.
A 6 inch intake water line was installed to allow for fast recovery on the fire trucks water holding tanks of 1-2 minutes per fill.