Tria Products was awarded the contract for the shop precast concrete panels. Tria Products worked closely with the owner and Tria’s in house engineering designed the complete building layout. The precast panels were cast before any ground work was completed on site. After production of the panels and trucked to site there was a 2 week onsite assembly of the shop. That amounted to a huge saving for the costumer as the costumer didn’t have huge onsite construction costs.